Verified Legal Answer Saudi Law 🇸🇦 العربية

Is it permissible for the owner to claim defects or deviations from the plans after their acceptance during execution and final handover?

1 views · 2 days ago

Legal Answer

Radiif AI Legal Assistant

⚡ Quick Answer:

It is not permissible for the owner to claim defects or deviations from the plans after their acceptance by him and by the project consultant during execution, and after the final handover of the project, as this is considered contrary to engineering norms.

It is not permissible for the owner to claim defects or deviations from the plans after their acceptance by him and by the project consultant during execution, and after the final handover of the project, as this is considered contrary to engineering norms.
Source: Radiif.com (رديف) · Saudi Legal AI Platform

Legal References & Citations

1
مبدأ قضائي - Article مبدأ

تقرير الخبير النهائي (بشأن قبول الأعمال المنفذة بالمخالفة للمخططات من المالك والاستشاري أثناء التنفيذ، ومخالفة المطالبة بها بعد الاستلام النهائي للأعراف الهندسية)

Share this answer:

About Radiif

Radiif is an AI legal platform specialized in Saudi Arabian law, providing answers verified by legal references and articles.

This answer is for general legal education and is not legal advice. Please consult a licensed attorney for your specific case.

Page Stats

Views 1
Citations 1
Language English 🇺🇸

Do you have specific details about your case?

Ask Radiif AI Legal Assistant now and get verified answers with exact citations from Saudi law.

Direct Legal Consultation

Do you want to consult a certified lawyer for this case?

We can suggest a list of certified lawyers with extensive expertise specifically in this domain.